Breezeway remodeling begins in downtown GJ

The breezeway on the south side of the 500 block of Main Street is being worked on in anticipation of phase two of the Downtown Uplift project.



100410 Breezeway
Purchase reprints

The breezeway on the south side of the 500 block of Main Street is being worked on in anticipation of phase two of the Downtown Uplift project.

Construction begins this week on remodeling two Main Street breezeways. The breezeways, located on the south side of the 500 block of Main Street and on the north side of the 600 block of…




COMMENTS

Commenting is not available in this channel entry.



  • Administrator/bookkeeper

    Mid-sized oil & gas company in Grand Junction is seeking anAdministra...

  • Spanish Instructor

    Intellitec Colleges is seeking a Full Timeat its Grand Junction C...

  • Repair Tech I

    The City of Glenwood Springs  Fleet Department is currently accepting

  • Detailer

    Professional Detail JobNo experience necessary but is a bonus. Will t...

  • Drivers

    Class A CDL Driver w/Tanker endorsement and/or Winch Truck Driver. 1 ...

  • Rn - Obstetrics Unit

    **Sign on Bonus andRelocation Assistance**Seeki...


Search More Jobs






THE DAILY SENTINEL
734 S. Seventh St.
Grand Junction, CO 81501
970-242-5050
Editions
Subscribe to print edition
E-edition
Advertisers
Sign in to your account
Information

© 2014 Grand Junction Media, Inc.
By using this site you agree to the Visitor Agreement and the Privacy Policy